MIL-P-29191B(YD1)
Handrails installed for service shall be
4.6.9 Handrail strength test.
tested with a 400 lb static load applied horizontal, perpendicular, and at a 45
Damage to the handrails, mountings, or
degree angle to the platform deck.
platform deck at mounting points which impairs serviceability shall be cause for
rejection.
The workboat platform shall be examined after
4.6.10 Post-test examination
Any visible damage, permanent deformation,
testing has been completed.
connection failure, or loosening of connections of any subsystem or component
shall constitute failure of this examination.
The preservation, packing, and marking of each
Packaging inspection.
7
4.
complete workboat shall be inspected to verify conformance Lo the requirements
of section 5.
PACKAGING
5.
Preservation shall be level A or commercial as specified
5.1 Preservation.
(see 6.2)
5.1.1 Level A
Disassembly shall be the minimum necessary to
5.1.1.1 Disassembly.
safeguard parts known to be subject to damage or loss, and to accomplish
Bolts, nuts, screws, pins, and washers removed shall be
reduction in cube.
reinstalled in one of the mating parts and secured to prevent their loss.
Cleaning processes, drying procedures,
5.1.1.2 Methods of Preservation.
preservatives, and methods of preservation specified in the following paragraphs
are listed in MIL-P-116 and shall conform to the requirements of MIL-P-116 and
any applicable specifications.
Unpainted and uncoated exterior
5.1.1.3 Unpainted and uncoated surfaces.
ferrous metal surfaces of the workboat and accessories shall be coated with type
P-1 preservative.
With the engine running smoothly at approximately
5.1.1.4 Outboard motor.
1,500 revolutions per minute (rpm), P-10 preservative shall be sprayed into the
The carburetors and
carburetor throat(s) until the engine chokes to a stop.
A waterproof tag shall be attached in a
cooling system shall be drained dry.
conspicuous location indicating "ENGINE PRESERVATIVE; DO NOT CRANK OR RUN".
The fuel tanks shall be drained of all fuel and dried.
5.1.1.5 Fuel tanks.
The interior of the tanks shall be coated with type P-10 preservative in a
The fuel lines, if
manner to insure thorough coating of all surfaces.
detachable, shall be packaged in a fiberboard box conforming to ASTM D5118,
class weather-resistant , and cushioned to prevent movement.
Each battery shall be placed inside the battery case and
5.1.1.6 Batteries
cushioned to prevent movement
The anchor and mooring line shall be
5 1.1.7 Anchor and mooring line.
coiled or banked and secured with cotton cord or twine
126p14" style="font-size:12px">13
Downloaded: 2014-09-30T19:59Z
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business